×
Register Here to Apply for Jobs or Post Jobs. X

CCTV System Upgrade in Compliance SIRA Law

Job in Dubai, Dubai, UAE/Dubai
Listing for: Iskaan Tech
Full Time position
Listed on 2026-02-20
Job specializations:
  • Maintenance/Cleaning
    Installation Technician
Salary/Wage Range or Industry Benchmark: 120000 - 200000 AED Yearly AED 120000.00 200000.00 YEAR
Job Description & How to Apply Below
Position: CCTV System Upgrade in Compliance with Latest SIRA Law

CCTV System Upgrade in Compliance with Latest SIRA Law

Compliance Posted On:
February 18, 2026 | Closing On:
February 25, 2026

Job Reference: JB004-26-00816

Scope of Work – CCTV System Upgrade with ANPR Integration

Project

Location:

Al Furjan, Dubai, United Arab Emirates.

Responsibilities and Requirements
  • Conduct detailed site assessment of existing CCTV and access control infrastructure.
  • The vendor shall be fully responsible for preparing and submitting all technical documents, layouts and system designs to SIRA for design review and shall coordinate directly with SIRA to obtain final compliance certification.
  • Supply, install, configure and commission the following components:
    • 4MP SIRA-approved cameras.
    • NVRs, network switches, UPS, storage devices and all associated accessories.
    • Structured cabling (if existing cables are not usable and the existing system is analog), conduiting, racks and mounting systems.
    • Integrate existing or new gate barrier system with ANPR cameras to restrict access to registered vehicles only.
  • Assess the condition and integration capability of existing gate barriers:
    • If found incompatible, the vendor shall propose replacement with SIRA-compliant automatic barriers, including installation and any required civil works.
  • Provide operator training and submit full handover documentation, including system layout, manuals and warranty certificates. Proposal must include:
    • Product datasheets (cameras, ANPR, NVRs, barriers).
    • Project methodology.
    • Minimum 1-year warranty on all equipment and installation.
    • Complete price breakdown with make, model, unit rate, quantity and total cost for each item.
Payment Terms
  • 50% upon completion of cabling and conduiting works, verified by the respective team.
  • 30% upon completion of all installation and system commissioning.
  • 20% upon submission of complete project documentation including system drawings, user manuals, warranty certificates and final SIRA NOC.
  • All payments are subject to verification of physical progress and compliance by HOAM. Final payment will only be processed upon receipt of the valid SIRA final approval certificate.
#J-18808-Ljbffr
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)

Job Posting Language
Employment Category
Education (minimum level)
Filters
Education Level
Experience Level (years)
Posted in last:
Salary