Engineering Specialist, Project Engineer, Engineer - Infrastructure/Engineering
Listed on 2026-03-12
-
Engineering
Environmental Engineer, Water Management
This service is set to disconnect automatically after {0} minutes of inactivity. Your session will end in {1} minutes. Click OK to reset the timer to {0} minutes.
You have been signed out. This service is set to sign out after {0} minutes of inactivity.
OrganizationPublic Utility Commission of Texas (PUCT)
Primary LocationTexas-Austin, 1701 N Congress Ave, Austin, 78701
Job SummaryEngineering Specialist, Project Engineer, or Engineer (Engineering Specialist II - VI, Project Manager II - V, Engineer III - VI) )
Employment StatusRegular (Exempt)
ScheduleState Job Code: - 2132; 1558 - 1562; 2154 - 2157
Grade: 20 B20 - B28
Monthly: $6,123.00 - $9,580.00 (B20 - B28)
Openings6
Job PostingMar 3, 2026, 2:28:19 PM
Closing DateOngoing
ApplicantsApplicants who applied for CAPPS # (Engineering Specialist, Project Engineer, or Engineer) should not reapply. Your application remains active and will continue to be considered.
The Public Utility Commission of Texas:
Your Gateway to a Fulfilling Career!
Applications must contain a complete job history, detailing: job title, dates of employment, name of employer, supervisor’s name and phone number, description of duties performed, demonstrating how you meet the minimum qualifications for the position. Resumes do not replace this required information. Applications stating, "See attached" or "See resume" will not be accepted. The experience listed on your resume must match the details on the CAPPS State of Texas Application.
Discrepancies will result in an incomplete application and will not be considered.
- Letter of Interest
- Resume
- Official or Unofficial College Transcripts
The hiring manager has requested the above document(s) be submitted with the CAPPS State of Texas Application. When submitting your documents, mark them as relevant.
Incomplete applications will not be considered. Work In Texas ApplicantsTo apply for the position, it is best to go to the CAPPS State of Texas Talent Management System to submit your application by going to and select our agency, Public Utility Commission of Texas, from the "Company/Agency" list. If applying through Work In Texas (WIT) you will also need to complete the supplemental questions and forms to be considered for this posting.
An automated email from the CAPPS State of Texas Talent Management System will be sent to your email on file in WIT with additional instructions.
The Public Utility Commission regulates the state’s electric, telecommunication, and water and sewer utilities, implementing respective legislation and offering customer assistance in resolving customer complaints.
About InfrastructureThe Infrastructure Division works to ensure that customers have electricity, water and sewer, and certain telecom services are readily available by addressing the ability of utilities and their infrastructure to meet customers’ need for adequate and continuous service. The division has three sections:
Engineering, Infrastructure Analysis, and Mapping.
The Engineering Section reviews and recommends routes for new electric transmission lines, electric utility requests to build new generating facilities, and requests for electric utility sales, transfers, and mergers. The section analyzes utilities’ cost of facilities, equipment, and supplies, the rate to allocate costs over their useful life, expenses to operate and maintain facilities, and funds set aside for emergency events.
The section also addresses electric reliability and service quality issues and complaints about the cost of obtaining utility service.
The Infrastructure Analysis Section addresses the need for water and electric utility service area changes as well as water utility purchases. In addition, the section addresses distressed water utilities, including the capital costs and operations and maintenance expenses incurred by temporary managers of those utilities; electric utility fuel and purchased power costs; electric utility energy efficiency programs designed to reduce customer energy use;
electric utility advanced metering systems; and telephone area codes and other numbering resource issues.
The Mapping Section…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).